>> EPC projects
>> Onshore Pipelines
>> Storage Tanks
>> Civil, Mechanical & E&I Projects
>> Maintenance of Storage tanks & pipelines
>> Installation of Dynamic Equipments
>> Supply & Fabrication of Static Equipments
>> Supply & Fabrication of Steel Structures
 
 
 
 
 
 
 
 
56 km pipeline from Halet Elmahgar petroleum deposit to Katamia airport:
 
Owner: Cooperative Petroleum Company (COOP).
 
Scope of work:
Design, supply, weld& install of 56 km seamless 8 inch coated pipeline.
   
 
Rehabilitation of Qena Petroleum Deposit:
 
Owner: Cooperative Petroleum Company (COOP).
 
Scope of work:
Supply & install of two petroleum pump stations (16 API petroleum pump).
   
 
8 km pipeline from Tanta petroleum deposit to Tanta Military airport:
 
Owner: Cooperative Petroleum Company (COOP)
 
Scope of work:
Design, supply, weld & install of 8 km seamless 6 inch coated pipeline.
   
 
Maintenance of onshore SUMED pipelines (sea lines No. 2, 3, 4 & 5):
 
Owner: Arab pipeline Company (SUMED)
 
Scope of work:
complete maintenance for two 48 inch pipelines & two 42 inch pipelines
   
 
Rehabilitation of 8 inch pipeline from Elbaloa petroleum Deposit till Elsalhia Airport (42 km):
 
Owner: Engineering for the petroleum & process Industries company (ENPPI)
 
Scope of work:
Complete maintenance of 42 km 8 inch underground pipeline including purging, pigging, hydrostatic test
   
 
Diesel storage tank No. 8 at El Max Petroleum Deposit of capacity 10000 Cubic meter (Diameter: 32 meter, Height: 16 meter)
 
Owner: Cooperative petroleum company (COOP)
 
 
 
   
 
Gasoline Storage Tank No. 10 at Elbaloa Petroleum Deposit of capacity 3000 Cubic meter (Diameter: 30 meter, Height: 6 meter)
 
Owner: Cooperative Petroleum company (COOP)